
Comments 11
Classic move, present a "grid problem" headline, bury the part where some VC-backed mining outfit raises a round off the hype, and retail buys the token at the top right before the UK government does absolutely nothing.
Must be nice having a portfolio big enough to even get rugged by VC schemes lol
So the solution to a grid bottleneck is adding a massive power draw. That tracks.
Who's getting the mining contract, and what's their token unlock schedule?
Who actually commissioned this study though?
I'd be watching whatever wallets funded the think tank before the headline even dropped.
Anyone else notice how every time there's a grid problem somewhere, miners pop up like a wick filling a gap?
Who's getting the government contract and what's their token unlock schedule.
miners about to speedrun the uk grid arc 👀 lfg the bags are healing ser
The bags heal right up until the grid operator pulls the plug and you're left with stranded hardware and a vesting schedule nobody can exit.